THE BUILDING
New location for a large and innovative company canteen, which welcomes hundreds of workers and their families every day. Here you can enjoy a quality lunch break in a modern ambience, with spacious, comfortable areas and continuous air renewal thanks to an efficient and sophisticated air conditioning system. This is where the Coster Group built the control system for the canteen used by employees in the Cagliari industrial area and regularly attended and enjoyed by Amazon workers.
THE PROJECT
The Coster Group control and supervision system uses the Modbus communication protocol at both hardware and software level. The WEBGARAGE platform communicates in Modbus protocol with all the system controllers (YHC 700, YLC 880 and related expansions).
The purpose of the project is to manage the production of fluids and regulate the room temperature inside the halls during the hours they are occupied. All control logic is loaded directly onto each controller, creating a distributed intelligence logic capable of operating autonomously even in the absence of communication between elements.
THE METHOD
• Air-to-water heat pump
• Pump station for the distribution of hot and cold fluids
• 2 Air handling units serving the LARGE hall
• 1 Air handling unit serving the GALLERY
THE ADVANTAGES
• Realisation of customised graphics on the WEBGARAGE platform.
• Easy connection with variables from the field, integrated via standard protocols
• Full YLC system: YHC 700 + YLC 880 + PEC 442 and Coster Group sensors